Prefabricated building solutions under one roof…
Projects
Sayfa:

Mersin METU College Sports Hall Completed.

Mersin METU Foundation of METU College Sports Hall built in the garden was completed and ready for 2012-2013 academic year.

Conex Containerized Construction Camp Office Buildings

Conex Containerized Constrcution Camp Office Buildings

Hasbaşak Meat Dairy Farm has been completed

Investing to Dairy Herd in the province of Polatli (Ankara) 250 head dairy farm investment firm Hasbaşak Meat Products made with Paysa Prefabricated Buildings. Farms as part of dairy cattle barn, maternity building, weed store and calf housing Fabric Structure technique and administrative building were made with construction of long product type of Paysa Panelized Modular Building.

The Herat road construction along with the Qala-i-Naw Workers' camp in Afghanistan was completed.

The road project that connects port situated on the northwest of Afghanistan and the Qaisar City. The overall project delivery time is 2 years due to the ongoing problems encountered by security issues. By completion of the works, region will turn into the junction with a double lane modern standard 260km road.

Shindand Aircraft and Helicopter Hangars handled over to U.S. Army Corps.

Shindand Aircraft and Helicopter Apron opened by U.S. Air Force including 26 aircraft and two helicopter hangars handled over to U.S. Army Corps by American tendering company.

Manas Univeristy prefers Paysa for Faculty Buildings

Paysan Prefabricated Light Steel Technology faculty building of 3600 square meters constructed within a short period of 6 months and progress to handing over stage for Kyrgyzstan-Turkey Manas University.

Turk-Kyrgyz Manas University Instructor Building Completed.

Paysa Instant Structures awarded to construct Instructor Building to the Turk-Kyrgyz Manas University Chingiz Aitmatov Campus. Completed within short period of 3 months, building can accommodate 300 students at the same time.

Modular composite panels mafufactured taking into account cold winter conditions prevailing in Bishkek, and completed in 90 days, including infrastructure.

Paysa modular structures applied in Aliaga Thermal Power Plant Construction Camp.

Paysa modular structures applied in Aliaga Thermal Power Plant Construction Camp.

Covering Tennis Court of the Ankara Tennis Club.

Ankara Tennis Club, which used as tennis school, consisted of four tennis courts covered by a single span fabric structure have been completed.

Sports International Top Spin Tennis School Indoor courts completed.

Sports International, Ankara's established and the oldest sport clubs as well as tennis school chose our company’s Fabric Structures to cover three tennis courts in a single span. Within three side by side tennis courts there is a 2-storey building used as social facility.

Sayfa: